Loading...
Fairfield Inn-CR170304 Halie Hernandez From:Matthew Mabry Sent:Monday, March 06, 2017 7:55 AM To:Halie Hernandez Subject:FW: Fairfield Inn and suites daily report Categories:This message has been archived by Retain on March 06 2017 17:41 Oops I put the wrong date on this one… should be 3-4-14 Sorry Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov From: Matthew Mabry Sent: Monday, March 06, 2017 7:52 AM To: Halie Hernandez <HHernandez@coppelltx.gov> Subject: Fairfield Inn and suites daily report PROJECT Fairfield Inn and suites PROJECT NO. OWNER CITY of COPPELL CONTRACTOR Northpoint Construction PROJECT INSPECTOR Matthew Mabry DAILY CONSTRUCTION REPORT DATE 3-3-2017 REPORT #1 1 DAY M T W T F S S Weather: Temp: Humidity: Wind: AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Scheduled to pour at 130 am. Had a few issues at the beginning with stabilizing the pump truck. After that everything ran smooth. No issues the rest of the pour SIGNATURE PUBLIC WORKS INSPECTOR: MATTHEW MABRY 2 Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov 3