PROJECT Fairfield Inn and suites
PROJECT NO.
OWNER CITY of COPPELL
CONTRACTOR Northpoint Construction
PROJECT INSPECTOR Matthew Mabry
DAILY CONSTRUCTION REPORT
DATE 3-3-2017 REPORT #1
DAY M T W T F S S
Weather:
Temp:
Humidity:
Wind:
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
1
CONSTRUCTION ACTIVITIES:
Scheduled to pour at 130 am. Had a few issues at the beginning with stabilizing the pump truck. After that everything ran smooth. No issues the
rest of the pour
SIGNATURE
PUBLIC WORKS INSPECTOR: MATTHEW MABRY