Loading...
Park West Crossing-CR170301 Halie Hernandez From:Matthew Mabry Sent:Thursday, March 02, 2017 2:47 PM To:Halie Hernandez Subject:Park West Phase II DR Categories:This message has been archived by Retain on March 02 2017 17:26 PROJECT Parkwest phase II PROJECT NO. OWNER CITY of COPPELL CONTRACTOR Strcturetone PROJECT INSPECTOR Matthew Mabry DAILY CONSTRUCTION REPORT DATE 3-1-2017 REPORT #1 DAY M T W T F S S Weather: Temp: Humidity: Wind: AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: 1 CONSTRUCTION ACTIVITIES: Still waiting on paving maintenance bonds, ADA inspection, and streets approval before I can sign the final acceptance letter. Was told by Robin Pervy that an agreement was made with the city prior to construction that the bonds were paid with the fees. I have not received any proof on this and George Marshall also has no idea what he is talking about SIGNATURE PUBLIC WORKS INSPECTOR: MATTHEW MABRY Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov 2