Westhaven Phase 2B-LR170220TESTED FOR:DATE:
PROJECT:OUR REPORT NO.:
TECHNICIAN: F. Love
WEATHER:Rainy TEMPERATURE RANGE :
Attef Abushakra, P.E.
ALPHA TESTING, INC.
Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of Alpha. The use of our name and
test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.
Westhaven Phase 2B
Coppell, Texas
Cullum Construction
The Alpha technician traveled to the above referenced site to observe ongoing work and perform field testing as requested.
Upon arrival at the site, the technician was informed that previously scheduled concrete pour for paving was cancelled due to
inclement weather.
Respectfully Submitted,
02/20/17
DAILY FIELD
2209 Wisconsin Street, Suite 100
Dallas, Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No. 813
162128-11
55 to 60 Degrees
Dallas, Texas
REPORT