Loading...
Park West Crossing-CR170306 Halie Hernandez From:Matthew Mabry Sent:Monday, March 06, 2017 2:04 PM To:Halie Hernandez Subject:Parkwest phase II daily report Categories:This message has been archived by Retain on March 06 2017 17:41 PROJECT Parkwest Phase II PROJECT NO. OWNER CITY of COPPELL CONTRACTOR Structuretone PROJECT INSPECTOR Matthew Mabry DAILY CONSTRUCTION REPORT DATE 3-6-2017 REPORT #1 DAY M T W T F S S Weather: Temp: Humidity: Wind: AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: 1 CONSTRUCTION ACTIVITIES: Landscaping. The Paving contractor came by to drop off the paving bonds but did not have our paperwork to go with it. He should be back today or tomorrow and I will issue the final acceptance letter and sign the TCO SIGNATURE PUBLIC WORKS INSPECTOR: MATTHEW MABRY Page _____ of _____ pages. Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov 2