Loading...
Freeport NIP(1)-LR 850807 (4) Maxim Engineers Inc. 23,!? ::,:~!-~ ',~ Concrete Gylinder Test R~d Date 08/07/85 Sample Date 07/30/85 Standam 6"x 12" Area 28.27 ~uare inche To L.H. Lacy Company Proj~ Freeport North - Coppe]], Texas ~ntra~or L.H. Lac~ Compan~ Concrete Supplier and Plant L.H. Lacy Company - 0n-s~te plant UixNo. Location of Placement P~V~ rig, Freeport Road, stat i on 4+00 Materials Source/ SSD Batch Wts. Description (Lbs,,Cu. Yd Other Data Cement Time Batched: Fly Ash Time Sampled: 4: 30 Coarse Aggregate Ticket No.: Intermediate Aggregate Temperature: Ambient 98° Concrete 8~~ Fine Aggregate Weather Conditions: Sunny Admixtures: 1. 2, Added Water Entrained Air Content 0 gal lons 5 % Specimen Age Slump Total Load Compressive Strength Strength Required Number (Days) Date Tested In. ~ Lbs. P.S. I, P. S, I. days FPN 25 7 08/06/85 2 87300 3088 3000/28 26 28 (08/27/85) 27 28 (08/27/85)' Curing ASTM C-31 Test Method Fracture Regular (UNO) Cyhnders Made By: ASTM C-39 S .K. Remarks and or Distnbution ART 12000-410199 L. H. Lacy Company - Neva Ransom (2) City of Coppell ~_