Loading...
Westhaven Phase 2B-CR170330 Halie Hernandez From:Matthew Mabry Sent:Friday, March 31, 2017 7:43 AM To:Halie Hernandez Subject:Westhaven II-B Categories:This message has been archived by Retain on March 31 2017 18:18 PROJECT Westhaven phase II-B PROJECT NO. OWNER CITY of COPPELL CONTRACTOR Gilco PROJECT INSPECTOR Matthew Mabry DAILY CONSTRUCTION REPORT DATE 3-30-2017 REPORT #1 DAY M T W T F S S Weather: Temp: Humidity: Wind: AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: 1 CONSTRUCTION ACTIVITIES: No work I called and talked to the paving contractor. A tree had fallen down right where they are pouring sidewalk SIGNATURE PUBLIC WORKS INSPECTOR: MATTHEW MABRY Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov 2