Loading...
Security Fire Systems-CS170406 Halie Hernandez From:Matthew Mabry Sent:Thursday, April 06, 2017 2:10 PM To:Halie Hernandez Subject:FW: Security Fire Systems - Mix designs Categories:This message has been archived by Retain on April 06 2017 17:34 This email needs to go in LF but not the actual PDF Thanks Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov From: Matthew Mabry Sent: Thursday, April 06, 2017 2:09 PM To: 'Casey McBroom' <cmcbroom@crossengineering.biz> Subject: RE: Security Fire Systems - Utility Submittals Page 2 I cannot approve the concrete for the piers, grade beams, or slab. But for the paving I need the strength to be minimum of 3600 psi. We also do not allow any fly ash in the concrete. Please get a new mix design and send back to me. Thanks Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov From: Casey McBroom \[mailto:cmcbroom@crossengineering.biz\] Sent: Thursday, April 06, 2017 1:58 PM To: George Marshall <GMarshall@coppelltx.gov>; Matthew Mabry <MMabry@coppelltx.gov> Cc: Marcus Marion <MMarion@coppelltx.gov> Subject: RE: Security Fire Systems - Utility Submittals Thank you sir. 1 Matthew/Marcus Please let me know if these are acceptable, and I’ll also get you the fire lane mix once it’s sent to me. Thanks. Casey McBroom, P.E. Project Engineer 131 South Tennessee McKinney, Texas 75069 972.562.4409 Office 972.900.5733 Cell 972.562.4471 Fax cmcbroom@crossengineering.biz From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Thursday, April 06, 2017 1:55 PM To: Casey McBroom <cmcbroom@crossengineering.biz>; Matthew Mabry <MMabry@coppelltx.gov> Cc: Marcus Marion <MMarion@coppelltx.gov> Subject: FW: Security Fire Systems - Utility Submittals Casey, They need to go to the Construction Inspector… I have copied them. George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov From: Casey McBroom \[mailto:cmcbroom@crossengineering.biz\] Sent: Thursday, April 06, 2017 1:52 PM To: George Marshall <GMarshall@coppelltx.gov> Subject: Security Fire Systems - Utility Submittals George Do these come to you for City approval? I don’t recall. We’re only lacking a fire lane concrete mix I believe. Thanks. 2 Casey McBroom, P.E. Project Engineer 131 South Tennessee McKinney, Texas 75069 972.562.4409 Office 972.900.5733 Cell 972.562.4471 Fax cmcbroom@crossengineering.biz 3