Loading...
Eckerd's-CS 981026 (2)/__,~/~ The City With A Beautiful Future P.O. BOX 478 COPPELL. TEXAS 75019 FILE P.O. Box 478 Coppell, Texas 75019 972-462-0022 John Maggiore, P.E. Richmond Group 12200 Stemmons Freeway, Suite 317 Dallas, Texas 75234 October 26, 1998 ~~S/COPPELL ADDITION Development Fee Assessment Dear Mr. Maggiore: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please 'make payment to the City of Coppell in thc amount of $7,312.32 and forward to thc Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. in, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: ECKERD'S/COPPELL ADDITION Date: 10/26/98 TOTAL AMOUNT ~)UE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $57.75 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $3,025.05 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1,125.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $1,687.32 $1,687.32 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $10,740.12 TOTAL AMOLrNT DUE PRIOR TO COUNCIL APPROVAL $7,312.32 DEVELOPMENT FEE WORKSHEET PROJECT: ECKERD'S/COPPELL ADDITION DATE: 10/26/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 1 inch = 2.5 ESU's I - 1 1/2 inch - 5 ESU's = ESU's 1 - 8 inch -- 2.5 ESU's Total #: 10 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 0: I Domestic Meter(s) @ $57.75 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 1 Fireline Meter(s) @ (100% due prior to issuance of water meters) $142.80 $2,882.25 Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESL's: 2.5 $450.00 ea. Wastewater Tap Inspection Fee: Total 0: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $4,500.00 $150.00 $57.75 $142.80 $0.00 $2,882.25 $35.00 $60.00 $1,125.00 $50.00 $50.00 Page1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A $1,687.32 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development coil/facts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: ECKERD'S/COPPELL ADDITION 10/26/98 ROADWAY IMPACT FEE: 2 Service Area * Category ** Commercial Land Use ** Others / Not Specified (Commercial) Building Size (Sq. Ft.) 11,200 Development Units ** 11.2 Vehicle Miles per Development Unit ** 4.76 Fee per Vehicle Mile *** Roadway Impact Fcc due ---- (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $300 $15,993.60 ** *** las per the 1980 Univest agreement, this property can not be assessed for Denton I Tap Rd. & Sandy Lake Rd. Therefore, a percentage was calculated by subtracting I out the total cost in service area 2 for all projects concerning Denton Tap Rd. & SandyI Lake Rd. and divide the remainder by the total cost of all the projects in the service area. The calculated percentage is 10.55%. (Figure 2 - Roadway Impact Fee Study) (Table 3 - Roadway Impact Fee Study) (Schedule 2, Page 3 - Roadway Impact Fee Study) Amount of Reduction $14,306.28