Loading...
ST16-01A-CS170405 (2) Priscilla Martinez From:Roberts, Jeff F. <JFRoberts@Halff.com> Sent:Wednesday, April 05, 2017 4:33 PM To:George Marshall; Crawford, Stephen Cc:Kent Collins; Romanowski, Mike Subject:RE: S. Belt Line Road - Draft Scope of Work George, To follow up on the monument/street signs. Would these be located at all intersections? Jeff Roberts, PE, CFM Civil Engineer O: (214) 217-6616 HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, TX 75081-2275 Righ t- click here to dow nlo… Halff.com | Facebook | Twitter | LinkedIn | YouTube From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Tuesday, April 04, 2017 12:30 PM To: Crawford, Stephen <sCrawford@Halff.com> Cc: Kent Collins <KCollins@coppelltx.gov>; Romanowski, Mike <mromanowski@halff.com>; Roberts, Jeff F. <JFRoberts@Halff.com> Subject: RE: S. Belt Line Road - Draft Scope of Work Stephen, Please see the attached comments on the documents. In addition we would like to consider incorporating a re-design of the Traffic Signal at Belt Line Road and Southwestern/Denton Tap. The City has a design done in-house but it would make sense to include in the project. We probably would bid the signal as an alternate, depending on funds and possibly pull the design out of the package for future use if necessary. Also, we would like to discuss a possible design of a pre-fab monument like the one at Denton Tap and Sandy Lake in the medians. See attached for general idea. We went with all the signs to be the same width in the end. But the construction took so long that we would rather see a pre-fab option that could drop in place. th We would love to still make the 25 council meeting. Thank You, George 1 George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov From: Crawford, Stephen \[mailto:sCrawford@Halff.com\] Sent: Tuesday, April 04, 2017 10:24 AM To: George Marshall <GMarshall@coppelltx.gov> Cc: Kent Collins <KCollins@coppelltx.gov>; Romanowski, Mike <mromanowski@halff.com>; Roberts, Jeff F. <JFRoberts@Halff.com> Subject: RE: S. Belt Line Road - Draft Scope of Work George, Wanted to follow up. We are continuing to work on developing our fees for the project. Do you know when we’ll have comments on the scope? Also, we want to make sure you have ample time to review our final scope and fees before everything is due for th City Council consideration. Are you still shooting for the April 25 Council meeting? Thanks. Stephen Crawford, PE, CFM Vice President Public Works Team Leader O: (214) 217-6605 C: (817) 455-6672 HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, TX 75081-2275 Righ t- click here to dow nlo… Halff.com | Facebook | Twitter | LinkedIn | YouTube From: Crawford, Stephen Sent: Tuesday, March 21, 2017 4:39 PM To: 'George Marshall' <GMarshall@coppelltx.gov> Cc: Kent Collins <KCollins@coppelltx.gov>; Romanowski, Mike <mromanowski@halff.com>; Roberts, Jeff F. <JFRoberts@Halff.com> Subject: S. Belt Line Road - Draft Scope of Work George, See attached for our draft scope of work for the S. Belt Line Road project per our discussion last Tuesday. Also attached are a few questions that we had while compiling the scope. 2 Let us know your comments to the scope and answers to these questions, and we can fine tune the scope and begin developing our fees. Have a great day. From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Wednesday, March 01, 2017 2:08 PM To: Crawford, Stephen <sCrawford@Halff.com> Cc: Kent Collins <KCollins@coppelltx.gov>; Kenneth Griffin <KGriffin@coppelltx.gov>; Romanowski, Mike <mromanowski@halff.com>; Jamie Brierton <JBrierton@coppelltx.gov>; Michael Garza <MGarza@coppelltx.gov> Subject: S. Belt Line Road Stephen, As discussed on the phone, we would like to schedule a scoping meeting with you and your staff for the reconstruction of Belt Line Road from I-635 to the intersection of Denton Tap, Southwestern and E. Belt Line. thth Monday and Tuesday the 13 and 14 of this month which will work for most of us. I believe the following times are currently free: Monday 10-11:45, 2:30-5pm and Tuesday 9:30-12, 2:30-5pm. I believe we only need an hour but it will be a full hour. Before the meeting we hope you can drive the corridor and observe the problems we see today and at least have preliminary scoping in mind. I will see about sending you files we currently have on the area. If you have any questions, please feel free to give me a call. Cell 469-964-4731. Team, feel free to jump in, if you think I missed something. Thanks, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov 3