Loading...
ST16-01A-CS170406 (3) George, Stephen or Mike if you have any questions or require any additional information., Jeff Please contact me Department.Thank you for the opportunity to serve the citizens of Coppell and the City of Coppell Engineering & Public Works th the project.construction budget as we move forward wisaving opportunities on these items and will work with you on the -We will work with the City for cost project.design phase for this -e City during the preliminaryThese items will be further discussed and evaluated with th listed items-Total for the above –$5,019,000 listed items-percent contingency on the above-20 – inch thick lime treated subgrade)-Standard Construction Detail 2010 specifies a pavement base consisting of 8inch asphaltic concrete base (City of Coppell -inch flexible base and 4-Pavement base consisting of 6 –$2,714,500  Line Road median Relocate and preserve the existing trees in the Belt – (4) lanes of traffic during construction.control items for the roadway median to maintain four -Temporary pavement and associated traffic –$1,073,000  discussed during the scoping meeting:re $19.4 Million estimate includes the following items which weis initial Th ).06.pdf-04-2017-Belattached file percent contingency (refer to the -level opinion of probable construction cost is $19.4 Million including a 20-The concept for additional scope and fee information. 06.pdf-04-2017-BeltLineScopeRefer to the attached file of $223,000.the fee includes a Basic Fee Amount of $1,003,000 and a Special Services (Time and Materials) Fee Amount $1,226,000; Halff’s proposed fee is Halff is pleased to present our updated scope and fee information for the Belt Line Road Project. Priscilla Martinez From:Crawford, Stephen <sCrawford@Halff.com> Sent:Thursday, April 06, 2017 5:48 PM To:George Marshall Cc:Kent Collins; Roberts, Jeff F.; Romanowski, Mike; Woodson, Todd Subject:Belt Line - Halff - Updated Scope and Fee Proposal Attachments:BeltLineScope-2017-04-06.pdf; BeltLineOPCC-2017-04-06.pdf Follow Up Flag:Flag for follow up Flag Status:Flagged Stephen Crawford, PE, CFM Vice President Public Works Team Leader O: (214) 217-6605 C: (817) 455-6672 HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, TX 75081-2275 Righ t- click here to dow nlo… 1 Halff.com | Facebook | Twitter | LinkedIn | YouTube 2