Prologis Park 121 Northwest Dr--DR170404
DAILY CONSTRUCTION REPORT
DATE ___04/04/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER Prologis
TEMP 85
CONTRACTOR: Mycon
WIND S. 27
HUMIDITY 32
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-The contractor poured the first half of the pavement
-From the approach to half of Northwest Dr. (South)
-I informed Pavecon that they can not spray curing compound all the way across the road because it was too windy
-Pavecon had to keep sweeping the road because the concrete trucks kept driving through the mu
Pavecon waited until 9:00am to pour because of the muddy condition