Prologis Park 121 Northwest Dr--DR170405
DAILY CONSTRUCTION REPORT
DATE ___04/05/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Scattered
Cloudy
OWNER Prologis
TEMP 70
CONTRACTOR: Mycon
WIND NW 28
HUMIDITY 30
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Pavecon is still going to finish the pour up to the next approach at
-Mycon is still working on the irrigation that was broken on Northwest Dr. North
-Pavecon will start tying the steel to all of the approaches after the pour
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.