Prologis Park 121 Northwest Dr--DR170406
DAILY CONSTRUCTION REPORT
DATE ___04/06/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER Prologis
TEMP 74
CONTRACTOR: Mycon
WIND NW 6
30
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-The contractor is working on the four approaches
-I reminded the contractor that the header needed to be installed
-I informed the contractor that I would be onsite tomorrow to perform a final inspection
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.