Prologis Park 121 Northwest Dr--DR170407
DAILY CONSTRUCTION REPORT
DATE ___04/07/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Scattered
Clouds
OWNER Prologis
TEMP 75
CONTRACTOR: Mycon
WIND S. 14
36
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-The contractor is pouring the approaches starting with the TXDOT approach
-Yesterday the TXDOT inspector informed Pavecon that they needed to place expansion material around the manholes and the water valves
-I informed Kevin Price that the 2 casings were installed and the irrigation should be operational
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.