Loading...
Prologis Park 121 Northwest Dr--DR170407 DAILY CONSTRUCTION REPORT DATE ___04/07/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Scattered Clouds OWNER Prologis TEMP 75 CONTRACTOR: Mycon WIND S. 14 36 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -The contractor is pouring the approaches starting with the TXDOT approach -Yesterday the TXDOT inspector informed Pavecon that they needed to place expansion material around the manholes and the water valves -I informed Kevin Price that the 2 casings were installed and the irrigation should be operational SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.