Prologis Park-DR170304 DAILY CONSTRUCTION REPORT DATE ___03/04/2017_12:30pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER Prologis TEMP 85 CONTRACTOR: Mycon WIND S. 27 HUMIDITY 32 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I re-inspected the steel for the pour -Mycon wants to try to pour on Wednesday -I informed the contractor that the ruts needed to be flattened and compacted and the soil was too moist Potter wants to try to pour on Friday at 7:00am SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.