Prologis Park-DR170304
DAILY CONSTRUCTION REPORT
DATE ___03/04/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER Prologis
TEMP 85
CONTRACTOR: Mycon
WIND S. 27
HUMIDITY 32
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-I re-inspected the steel for the pour
-Mycon wants to try to pour on Wednesday
-I informed the contractor that the ruts needed to be flattened and compacted and the soil was too moist
Potter wants to try to pour on Friday at 7:00am
SIGNATURE
PUBLIC WORKS INSPECTOR