Loading...
Prologis Park-DR170305 DAILY CONSTRUCTION REPORT DATE ___03/05/2017_12:30pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Scattered Cloudy OWNER Prologis TEMP 70 CONTRACTOR: Mycon WIND NW 28 HUMIDITY 30% PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -The contractor is working on the items that I informed him needed to be fixed -The contractor informed me that the wanted a final inspection for tomorrow for their Friday pour -Mycon is still working on the building SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.