Prologis Park-DR170305
DAILY CONSTRUCTION REPORT
DATE ___03/05/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Scattered
Cloudy
OWNER Prologis
TEMP 70
CONTRACTOR: Mycon
WIND NW 28
HUMIDITY 30%
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-The contractor is working on the items that I informed him needed to be fixed
-The contractor informed me that the wanted a final inspection for tomorrow for their Friday pour
-Mycon is still working on the building
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.