Prologis Park-DR170307
DAILY CONSTRUCTION REPORT
DATE ___03/07/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Scattered
Clouds
OWNER Prologis
TEMP 75
CONTRACTOR: Mycon
WIND S. 14
36
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Potter is pouring the concrete on the northeast corner of the property
-I informed the contractor that they needed to make some adjustment to their steel
-Mycon is still working on the building
SIGNATURE
PUBLIC WORKS INSPECTOR