Loading...
Copperstone-CS 941219DOX,,Yv,'DE:r, ANDERSON AND ASSOCIATE~, INC. CIVIL eNGiNeeRs 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 FAX (214) 93,1-9538 December 19, Mr. Kenneth Griffin, P. E. City Engineer City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Re: r Stone n ~Im%pa_ct Fee Dear Ken: We are in the process of preparing the final plat for filing at Dallas County. It is my understanding that the water and sanitary sewer impact fees are due prior to recordation of the plat. Centex Real Estate Corporation will probably construct the water improvements in 1995. Due to this situation, I obtained a quotation for the 16" water main that will be installed inlParkway Boulevard. In addition, I obtained a quotation for a 12" water main for comparison purposes. In accordance with the Subdivision Ordinance, Appendix A, we would appreciate obtaining credit for the oversized water main, which is shown on the Master Water Plan. Our construction plans show the limits of the installation being from the intersection of Cowboy Drive and Parkway Boulevard to existing Parkway Boulevard (Village of Cottonwood Creek, Section IV). This length is 2484.61 feet. Of this length, 450 feet is offsite to Copper Stone. Below is a calculation which if acceptable, should be offset against the water impact feet ($650.00/Lot)+ irrigation services. Impact Fee (August 15, 1994) Average 16" Water Main Cost Average 12" Water Main Cost Copper Stone Frontage $112,257/2484 $ 65,889.40/2484 $94,250.00 45.19/LF 26.53/LF 2035 LF Impact fee reduction due to oversizing: 2035 LF ($45.19-$26.53) Offsite Water Improvements (450') ($45.19) TOTAL AMOUNT TO BE DEDUCTED FROM WATER IMPACT FEE TOTAL AMOUNT OF WATER IMPACT FEE DUE $ 37,973.10 $ 20,335'.50 $ 58,308.60 $ 35,941.40 Mr. Ken Griffin Page 2 December 19, 1994 Please review these calculations so that the Developer can complete the filing of the final plat. Very truly yours, William A. Anderson, P. E. WAA; jrb CC: Derek Earle, P.E. Centex Real Estate Corporation