Copperstone-CS 940815The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
August 15, 1994
Mr. Bill Anderson
Dowdey, Anderson and Associates, Inc.
16250 Dallas Pkwy., Suite 100
Dallas, Texas 75248
RE: Copper Stone Estates
Development Fee Assessment Revisions
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Revised Development Fee Assessment list, along with a
copy of the Development Fee Calculations for Copper Stone Estates.
Please make payment to the City of Coppell in the amount of $133,250.00 and forward it to Alan
Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's
estimate or contract for this project will need to be provided to our department so the construction
inspection fee can be verified.
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project and if you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
CCi
Alan Johnson, Finance Director
Greg Jones, Building Official
Steve Goram, Director of Public Works
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date: August 15, 1994
Project: Copper Stone Estates Revised
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $ 94,250.00 $ 94,250.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $ 13,300.00 -0-
(100% due at Issuance of Water Meter)
Wastewater Impact Fee MUD $ 29,250.00 $ 29,250.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee $ 13,000.00 -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $ 6,500.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) $ 2,892.50 -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-Residential) -0-
(100% due at Issuance of Water Meters)
Water Meter Deposit (Residential) $ 3,900.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire) $ 387.30 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit $105.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee $ 2,727.55 -0-
(100% due prior to Acceptance of Project)
Street Light Fee $ 7,022.40 -0-
(100% due prior to Acceptance of Project)
Park Fee $19,500.00 $ 9,750.00
(50 % due prior to Council Approval) (50 % = $9,750.00)
(50% due prior to Issuance of Building Permit) (50% =$9,750.00)
Construction Inspection Fee need submittal of -0-
(2 % of Project Cost due prior to Preconstr. Mtg.) comracts
TOTAL $ 192,834.75
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 133,250.00
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
August 12, 1994
Engineering Departme~
Public Works Staff ~
Development Fees for 'Copperstone
Estates Second Revision
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
130 - 5/8" x 3/4"
3 - 1 1/2"
Total 145
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
130 ESU's
15 ESU's
ESU's
ESU's @ $650.00 ea = $ 94,250.00
100% due prior to Council approval of the final plat.
Wastewater Impact (MUD)
130 - 5/8" x 3/4" Domestic Meter/s =
Total 130 ESU's @ $225.00 ea =
130 ESU ' s
$ 29,250.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
133 Connections @ $100.00 each = $13,300.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
130 Connections @ $100.00 each = $ 13,000.00
100% due prior to issuance of building permit. (Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
130 _ lots @ $50~-00/-lot = $ 6,500.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
130 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 2,892.50
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
3 - 1 1/2" Irrigation Meter/s @ $ 129.10 ea = $ 387.30
- Fireline Meter/s @ $
100% due prior to issuance of water meter/s.
ea = $
Water Meter Deposit (Residential)
130 Meters @ $30.00 ea = $ 3,900.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
3 Meters @ $35.00 ea = $ 105.00
100% due prior to issuance of water meters.
Development Fees
Page 3
Park Fee
For those develop~gnts having preliminary plat approval prior to June
23, 1'992 the following assessment is determined:
130 Residential Lots at $150.00 each = $ 19,500.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
Residential Lots at $1,285.00 each = $
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Development Fees
Page 4
Street Signs Fee
See attached Street Si-gn Assessment sheet.
100% due prior to final acceptance of project.
cc:
Steven G. Goram, Director of Public Works
G. Greg Jones, Chief Building Official
Development Fees
Page 5
for Copper Stone
STREET SIGN ASSESSMENT
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 27 $1,715.58
Yield $58.56
Stop $65.12
Street Name $11.60 2 23.20
Stop & Street Combo $96.85 871.65
OTHER
No outlets (30") $58.56 117.12
TOTAL $2,72 7.55
DEVFEES.HLP/COPPER.HLP
COPPELL PUBLIC WORKS
DATE:
TO:
FROM:
RE:
MEMORANDUM
March 21, 1994
Mike Martin, Graduate Engineer /'/~
Rey Gonzales, Streets Superintenden~3/
Street Light Assessment - Copper Stone Estates
The following assessment represents the number of light units as
established by T.U. Electric for this subdivision. Please insure
that the developer receives a copy of this assessment and that the
fee is paid prior to final acceptance. Thank you.
24 lights @ $292.60 per light - $7,022.40
If you have any questions, please call.
RG/dm
cc: Central File
STLTE\COPPERS