Loading...
Fairfield Inn-LR170330CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94161112.0037 Irerracon Service Date: 03/30/17 8901 Carpenter Fwy Ste 100 Report Date: 04/10/17 Dallas, TX 75247-4547 Task: 214-630-1010 Reg No•F-3272 Client Northpoint Construction Attn: Dilip Pranav 8530 Esters Blvd Irving, TX 75063 Material Information Specified Strength: 6,000 psi @ 28 days Mix ID: 7520 Supplier: Charley's Batch Time: 1100 Plant: 12 Truck No.: 1368 Ticket No.: 421464 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pef): Yield (Cu. Yds.): Laboratory Test Data Result Specification 5 3-5 4.0 3-6 76 62 141.6 Project Fairfield Inn - Coppell TX Northpoint Or at SH 121 Coppell, TX Proiect Number: 94161112 Sample Information Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Set Specimen Avg Diam. Area Date Date No. ID (in) (sq in) Received Tested 1 1 4.00 12.57 04/06/17 1 2 4.00 12.57 04/27/17 1 3 4.00 12.57 04/27/17 1 4 4.00 12.57 04/27/17 1 5 4.00 12.57 05/25/17 03/30/17 Sample Time: 1215 Jamar George Light breeze 10/30 Batch Size (cy): 10 Direct Discharge See Placement Location Northpoint Dr., Rear of Street, NE Dumpster Pad Slab Age at Maximum Compressive Test Load Strength Fracture (days) (lbs) (psi) Type 7 51,585 4,110 4 28 28 28 56 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Jamar George Reported To: Contractor: Report Distribution: (1)Northpoint Construction, Dilip Pranav (1) Kencarkey Interests LLC, Jeremy Henicke Reviewed By: _ (1)Northpoint Construction, Jamic Ogden Senior Project Materials Engineer Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR°°°1, 11-16-12, R0vb Page 1 of 1 REINFORCING STEEL OBSERVATIONS REPORT Report Number: 94161112.0036 Service Date: 03/30/17 8901 Carpenter Fwy Ste 100 Report Date: 04/10/17 Dallas, TX 75247-4547 214-630-1010 RegNo:F-3272 Client Project Northpoint Construction Fairfield Inn - Coppell TX Attn: Dilip Pranav Northpoint Dr at SH 121 8530 Esters Blvd Coppell, TX Irving, TX 75063 Project Number: 94161112 PROJECT DATA Drawings Utilized: Sheets/Details: TR -1.0, dated 01/05/17 Locations/Items Observed: Reinforcing steel bar @ Dumpster Pad Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT ANCORRECT i ITEMSOBSERVED CORRECT ANCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Be, Length and Shape X Column Tie Spacing B Type Bersize X Proper Bar Placement X Stirrup Spacing S Type Bar Dome X Property Tied X Waded Splices Reber Clean X Dowel Bars In Place X Mechenleal splices Tmsh B Debris Removed X Proper Bar Supports X rapped Spikes X Numberof Bars X Proper CoverlClearence X Discrepancies/Comments: No discrepancies were noted at the time of this observation Services: Reinforcing steel (rebar) placement observation. Terracon Rep.: Jamar George Reported To: Contractor: Report Distribution: (I) Northpoint Constmction, Dilip Pranav (1) Kencarkey Interests LLC, Jeremy Hcnicke (1) Northpoint Construction, Jamie Ogden Reviewed By: s Davi-Iri'el;-10 Senior Project Materials Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. R940003, 07-01-12, Rev.() Page 1 of 1 dka CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94161112.0043 Irerracon Service Date: 04/06/17 8901 Carpenter Fwy Ste 100 Report Date: 04/16/17 Dallas, TX 75247-4547 Task: 214-630-1010 Reg No:F-3272 Client Project Northpoint Construction Fairfield Inn - Coppell TX Attn: Dilip Pranav Northpoint Dr at SH 121 8530 Esters Blvd Coppell, TX Irving, TX 75063 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: 4703 Supplier: Charley's Concrete Batch Time: 1036 Plant: Keller Truck No.: 751 Ticket No.: 163286 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pct): Yield (Cu. Yds.): Result Specification 53/4 4-6 3.8 3.5-6.5 74 1 69 1 146.9 4.00 Laboratory Test Data Set Specimen Avg Diam. No. ID (in) 1 1 4.00 1 2 4.00 1 3 4.00 1 4 4.00 1 5 4.00 Comments: Project Number: 9416111: Sample Information Sample Date: 04/06/17 Sample Time: 1125 Sampled By: Michael Kennedy Weather Conditions: Clear Accumulative Yards: 10/30 Batch Size (cy): 10 Placement Method: Pump Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: 10' N from SW comer of Elevator pit Placement Location: Elevaror Pit, Walls & Perimeter Beam Age at Area Date Date Test (sq in) Received Tested (days) 12.57 04/07/17 04/13/17 7 12.57 04/07/17 04/20/17 14 12.57 04/07/17 05/04/17 28 12.57 04/07/17 05/04/17 28 12.57 04/07/17 06/01/17 56 Maximum Compressive Load Strength Fracture (lbs) (psi) Type 38,670 3,080 1 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Michael Kennedy Reported To: James Contractor: Report Distribution: (1) Northpoint Construction, Dine Pranav (1) Kencarkey Interests LLC, Jeremy Henicke Reviewed By: _ r (1) Northpoint Construction, Jamie Ogden '�• B -r' •� ` Senior Project Materials Engineer Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001,11-I6.12,Re16 Page I of I REINFORCING STEEL OBSERVATIONS REPORT Report Number: 94161112.0042 Service Date: 04/06/17 8901 Carpenter Fwy Ste 100 Report Date: 04/16/17 Dallas, TX 75247-4547 214-630-1010 Reg No: F-3272 Client Project Northpoint Construction Fairfield Inn - Coppell TX Attn: Dilip Pranav Northpoint Dr at SH 121 8530 Esters Blvd Coppell, TX Irving, TX 75063 Number: 94161112 PROJECT DATA Drawings Utilized: Sheets/Details: Elevation Pit Wall @ FD -0.2/14+15, dated 07/16/15 & FD -0.5/22 dated 07/16/15, Beam Locations/Items Observed: Elevator Pit Walls & Perimeter Beam Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED. CORRECT INCORRECT '. Placing Drawings Approved X Bar Length and Shape X Carman Tie Spacing &Typo Bar Size X Proper Bar Placement X Stirrup spacing &Type Bar Goods X Prcimly Tied X WOldod Splices Rebar Clean X Dowel Bars In Place X Mechanical Splices Trash &Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper CovedCiearence X Discrepancies/Comments: No discrepancies were noted at the time of this observation Services: Reinforcing steel (rebar) placement observation. Terracon Rep.: Michael Kennedy Reported To: James Contractor: Report Distribution: (I) Northpoint Construction, Dilip Pranav (1) Kencarkey Interests LLC, Jeremy Henicke (I)Northpoint C(ostrUction, Jamic Ogden Reviewed By: David A. liLrl Senior Project Materials Engineer The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. R940003, 07-01-12, Rev() Page 1 of I CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94161112.0034 Irer racon Service Date: 03/15/17 8901 Carpenter Fwy Ste 100 Report Date: 04/16/17 Revision 2 - 28-day results Dallas, TX 75247-4547 Task: 214-630-1010 Reg No:F-3272 Client Northpoint Construction Attn: Dilip Pranav 8530 Esters Blvd Irving, TX 75063 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: 5632 Supplier: Charley's Batch Time: 0405 Truck No.: 740 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pct): Yield (Cu. Yds.): Plant: 125107 Ticket No.: 161844 Result Specification 43/4 3-5 5.5 3.5-5.5 59 03/18/17 49 4.00 143.3 03/22/17 Laboratory Test Data Project Fairfield Inn - Coppell TX Northpoint Dr at SH 121 Coppell, TX Proiect Number: 94161112 Sample Information Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Set Specimen Avg Diam. Area Date Date No. ID (in) (sq in) Received Tested 1 1 4.00 12.57 03/18/17 1 2 4.00 12.57 03/22/17 1 3 4.00 12.57 04/12/17 I 4 4.00 12.57 04/12/17 1 5 4.00 12.57 04/12/17 4.00 12.57 05/10/17 03/15/17 Sample Time: 0445 Siale (Charlie) Langi Partly cloudy 40/280 Batch Size (cy): 10 Pump 0 0 Location #1, see attached sketch Pavement, see attached sketch Age at Maximum Test Load (days) (lbs) 3 47,890 7 51,715 28 54,810 28 66,470 28 61,810 Average (28 days) 56 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Compressive Strength Fracture (psi) Type 3,810 2 4,120 3 4,360 5 5,290 5 4,920 5 4,860 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Siale (Charlie) Langi Reported To: Contractor: Report Distribution: (1) Nonhpoint Construction, Dilip Pmnav (1) Northpoint Construction, Jamie Ogden Test Methods: (1) Kenearkey Interests LLC, Jeremy Henicke The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 11-16-12, Ree6 Page I of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94161112.0034 Ferracon Service Date: 03/15/17 8901 Carpenter Fwy Ste 100 Report Date: 04/16/17 Revision 2 - 28 -day results Dallas, TX 75247-4547 Task: 214-630-1010 Reg No:F-3272 Client Project Northpoint Construction Fairfield Inn - Coppell TX Attn: Dilip Pranav Northpoint Dr at SH 121 8530 Esters Blvd Coppell, TX Irving, TX 75063 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: 5632 Supplier: Charley's Batch Time: 0455 Truck No.: 983 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pct): Yield (Cu. Yds.): Plant: 125107 Ticket No.: 161852 Result Specification 43/4 3-5 5.5 3.5-5.5 59 49 143.7 Project Number: 94161112 Sample Information Sample Date: 03/15/17 Sample Time: Sampled By: Siale (Charlie) Langi Weather Conditions: Partly cloudy Accumulative Yards: 120/280 Batch Size (cy): Placement Method: Pump Water Added Before (gal): 0 Water Added After (gal): 0 Sample Location: Location #2, see attached sketch Placement Location: Pavement, see attached sketch 0545 10 Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 2 1 4.00 12.57 03/18/17 3 50,120 3,990 3 2 2 4.00 12.57 03/22/17 7 63,990 5,090 2 2 3 4.00 12.57 04/12/17 28 75,600 6,020 2 2 4 4.00 12.57 04/12/17 28 72,770 5,790 3 2 5 4.00 12.57 04/12/17 28 74,440 5,920 2 Average (28 days) 5,910 2 6 4.00 12.57 05/10/17 56 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Siale (Charlie) Langi Reported To: Contractor: Report Distribution: (1) Northpoint Construction, Dint, Prmav (1) Northpoint Construction, Jamie Ogden Test Methods: (1) Kemukey Interests LLC, Jeremy Henicke The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 11-16-12, Rev.6 Page 2 of 3 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94161112.0034 Irerracon Service Date: 03/15/17 8901 Carpenter Fwy Ste 100 Report Date: 04/16/17 Revision 2 - 28-day results Dallas, TX 75247-4547 Task: 214-630-1010 Reg No:F-3272 Client Northpoint Construction Attn: Dilip Pranav 8530 Esters Blvd Irving, TX 75063 Material Information Specified Strength: 4,000 psi @ 28 days Mix ID: 5632 Supplier: Charley's Batch Time: 0532 Truck No.: 721 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pef): Yield (Cu. Yds.): Plant: 125107 Ticket No.: 161860 Result Specification 5 3-5 5.1 3.5-5.5 58 (sq in) 47 1 144.5 12.57 Laboratory Test Data Set Specimen Avg Diam. Area No. ID (in) (sq in) 3 1 4.00 12.57 3 2 4.00 12.57 3 3 4.00 12.57 3 4 4.00 12.57 3 5 4.00 12.57 3 6 4.00 12.57 Project Fairfield Inn - Coppell TX Northpoint Dr at SH 121 Coppell, TX Proiect Number: 94161112 Sample Information Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Date Date Received Tested 03/18/17 03/22/17 04/12/17 04/12/17 04/12/17 05/10/17 03/15/17 Sample Time: 0630 Siale (Charlie) Langi Partly cloudy 200/280 Batch Size (cy): 10 Pump Location #4, see attached sketch Pavement, see attached sketch Age at Maximum Test Load (days) (Ibs) 3 36,980 7 48,535 28 50,900 28 52,390 28 53,250 Average (28 days) 56 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Compressive Strength Fracture (psi) Type 2,940 3 3,860 2 4,050 3 4,170 2 4,240 2 4,150 Services: Obtain samples of fresh concrete at the placement locations, perforin required field tests and cast compressive strength samples. Terracon Rep.: Siale (Charlie) Langi Reported To: Contractor: Report Distribution: (1) Nonhpoint Constmction, Dilip Pmnav (1) Kencarkey lntemsts LLC, Jeremy Henicke Reviewed By: (1) Northpoint Constmctien, Jamie Ogden UA.B_WAg- s Senior Project Materials Engineer Test Methods: The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001, 11-16-12, Rev.6 Page 3 of 3 •yq R.,ti .:.. 1 •y: dewlawl }�ar+g ew n+urva air �' Z :' G ,�%46�»q�p f'l�� qg Po 4,yw' 4'r,r •q}Jy4.4 n.vay-a�+q,1 ; 'M( v k3 19'q MR-4 *r s v0 q�q¢ gPg4,u •;ey q bg4 q� 6�,6q, f p444b 6 ¢®qq r 0 o aq q q� q,�' , � ggqqs•�k a WKgdgg4Ea. M4 ^9A 4�.9aga q,,`%s9i�fiF�1.4A�oq.�¢,¢''.9.a4agaae�a.,gsj�qqq�m`tV?'°o4ego, e s I:_ d Os GM : CONCRETE COMPRESSIVE STRENGTH TEST REPORT S Report Number: 94161112.0033 Irerr Service Date: 03/15/17 8901 Carpenter Fwy Ste 100 Report Date: 04/16/17 Revision 1 - 28 -day results Dallas, TX 75247-4547 Task: 214-630-1010 Reg No:F-3272 Client Northpoint Construction Attn: Dilip Pranav 8530 Esters Blvd Irving, TX 75063 Material Information Specified Strength: 6,000 psi @ 28 days Mix ID: 7520 Supplier: Charley's Batch Time: 0323 Plant: 125501 Truck No.: 724 Ticket No.: 161840 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Laboratory Test Data Result Specification 43/4 3-5 5.4 3.5-5.5 58 49 144.1 Set Specimen Avg Diam. Area No. ID (in) (sq in) I 1 4.00 12.57 1 2 4.00 12.57 1 3 4.00 12.57 1 4 4.00 12.57 1 5 4.00 12.57 1 6 4.00 12.57 Project Fairfield Inn - Coppell TX Northpoint Dr at SII 121 Coppell, TX Project Number: 94161112 Sample Information Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: 03/15/17 Sample Time: 0415 Siale (Charlie) Langi Partly cloudy 40/50 Batch Size (cy): 10 Pump 0 0 See Placement Location Pavement, see attached sketch Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Compressive Age at Maximum Date Date Test Load Received Tested (days) (lbs) 03/18/17 3 39,780 03/22/17 7 57,710 04/12/17 28 74,560 04/12/17 28 79,290 04/12/17 28 74,750 Average (28 days) 05/10/17 56 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Compressive Strength Fracture (psi) Type 3,170 5 4,590 5 5,930 2 6,310 3 5,950 2 6,060 Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Siale (Charlie) Langi Reported To: Contractor: Report Distribution: (1) Northpoint Construction, Di(ip Pmnav (1) Kencarkey Interests LLC, Jeremy Henicke Reviewed By: (I) Northpoint Construction, Jamie Ogden IM d'A. Bt!j Senior Project Materials Engineer Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparently similar or identical materials. CR0001, II -16-12, R,v.6 Page I of I Y fy i y ❑�❑ �g t � - . �+�' zea � � � Y s-�L m s •q�yr.yyv ,• M1 `. - (Zou � ` �y� •y f ✓. " �.p IAC � V i � „' icy 4r M1 ✓!� W,Ii �. `^�+ � pl•�p�y � � :�yi�/ g�`� bJ61 ; :r r.� „ � .,a5yay _ q' ♦ 4 ' a r t 4 y QO z �%CZ 1. v �' x% y o . Ci :Y �_.� � {nCt+... M1 ..—'k.�k• .. Jaz .. _ i� � . _ Ve �/f4�9gy6���AgF 4d Ori fr�ggqqaq t4,�4®r 94 � q'�4 +s"�"sqT <<L v xor®� Wild.+m Y ♦)..' d. ?d�1A4.9�q qA �b��q'� LABORATORY COMPACTION CHARACTERISTICS OF SOIL REPORT Report Number: 94161112.0038 Service Date: 04/03/17 Report Date: 04/13/17 lient Northpoint Construction Attn: Dilip Pranav 8530 Esters Blvd Irving, TX 75063 Material Information Source of Material: Native material Proposed Use: Common fill Laboratory Test Data Test Procedure: ASTM D698 Test Method: Method A Sample Preparation: Wet Rammer Type: Mechanical Maximum Dry Unit Weight (pct): 101.7 Optimum Water Content (%): 21.4 Comments: Services: Moisture -Density Relations Project Fairfield Inn - Coppell TX Northpoint Dr at SH 121 Coppell, TX Project Number: 94161112 Irerracon 8901 Carpenter Fwy Ste 100 Dallas, TX 75247-4547 214-630-1010 Reg No: F-3272 Sample Information Sample Date: 04/03/17 Sampled By: Armando Rendon Sample Location: Stockpile Sample Description: Dark brown clay Result Specifications Liquid Limit: 76 Plastic Limit: 23 Plasticity Index: 53 In -Place Moisture (%): Passing #200 (%): 76.7 USCS: Zero Air Vo ids Curve fo r Ass umed Specific Gravity 2.70 Terracon Rep.: Armando Rendon Reported To: Contractor: Report Distribution: (I) Northpoint Construction, Dilip Pranav (1)Kencarkey Interests LLC, Jeremy Henicke (1) Northpoint Construction, Janne Ogden ImmommommmoII m MENEEMENNEEN Water Content (%) Reviewed By: David A. Belcher, P.E. Senior Project Materials Engineer Test Methods: ASTM D698, ASTM Dl 140, ASTM D4318 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. C110006, 10-16-13, R.0 Page 1 oft