Prologis Park-DR170306 (2)
DAILY CONSTRUCTION REPORT
DATE ___03/06/2017_03:25pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 75
CONTRACTOR: CORE
WIND S 25
HUMIDITY 53
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Mycon can not set any wall panels today because it is too windy.
The contractor is hanging steel for the roof and the wall panels
Potter is still setting rebar for the wall panels. They should be complete with pouring the wall panels o Friday
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.