Prologis Park-DR170308
DAILY CONSTRUCTION REPORT
DATE ___03/08/2017_03:53pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Scattered
Clouds
OWNER CITY of COPPELL
TEMP 77
CONTRACTOR: CORE
WIND S 14
HUMIDITY 31
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Mycon is hanging wall panels
Mycon is still hanging steel and connecting the columns to the wall panels
SIGNATURE
PUBLIC WORKS INSPECTOR