Loading...
Prologis Park-DR170308 DAILY CONSTRUCTION REPORT DATE ___03/08/2017_03:53pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Scattered Clouds OWNER CITY of COPPELL TEMP 77 CONTRACTOR: CORE WIND S 14 HUMIDITY 31 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Mycon is hanging wall panels Mycon is still hanging steel and connecting the columns to the wall panels SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.