Prologis Park-DR170321
DAILY CONSTRUCTION REPORT
DATE ___03/21/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Sunny
OWNER Prologis
TEMP 81
WIND S. 15
CONTRACTOR: Mycon
HUMIDITY 41
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Potter is working on the steel for the next pour tomorrow. The pour should take place at 7:00am
-The header for the approach on the north side is being prepared
-Mycon is still hanging steel on the roof of the building.
SIGNATURE