Prologis Park-DR170322
DAILY CONSTRUCTION REPORT
DATE ___03/22/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER Prologis
TEMP 81
CONTRACTOR: Mycon
WIND SSE 13
HUMIDITY 57
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Potter started pouring concrete at 6:00am
-I sent an email to the GC informing them that I will not inspect until the day of the pour and the police will issue citations
-Potter poured the north side of the building
-Potter is tying the steel to the northeast section of the property
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.