Prologis Park-DR170323 DAILY CONSTRUCTION REPORT DATE ___03/23/2017_12:30pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER Prologis TEMP 80 CONTRACTOR: Mycon WIND S. 36 43 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I performed a steel inspection the northeast corner of the property -After the contractor removed the trash debris, I let the contractor know that it was ok to pour the concrete. -The contractor is still working on the steel for the roof. SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.