Prologis Park-DR170311
DAILY CONSTRUCTION REPORT
DATE ___03/11/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER Prologis
TEMP 72
CONTRACTOR: Mycon
WIND NE 7
HUMIDITY 59%
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-The contractor submitted the revised plans to George and I
-No work is being done because of the poor weather.
-I informed Mycon that the street needed to be swept because of all of the dirt in the road.
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.