Loading...
Freeport NIP(4)-CS 960625DATE: TO: FROM: RE: COPPELL ENQINEERING STREET DEPARTMENT MEMORANDUM July 25, 1996 Larry Davis, Construction Inspector Stent Adams, Street Department Walk thru for MEPC, Phase 2 A walk thru on the above reference~project was conducted on July 25, 1996 and the items below were approved. Royal Lane South Drive Approach Ro~al Lane North Drive ApprOaoh Creekview East Drive Approach Creekview West Drive Approach BA/cg