PA1501B-CS170302
DAILY CONSTRUCTION REPORT
DATE ___03/02/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER CITY of COPPELL
TEMP 43
CONTRACTOR: CORE
WIND SSE 1
66
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
The landscapers are installing irrigation and finishing landscaping
East
The contractor is still working on framing on the performance pavilion
Prepping the retaining wall on the east side of the performance pavilion to be poured
Miller Sierra is stripping the retaining wall on the north side of the property
CORE is still working on the grand pavilion
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.