Loading...
PA1501B-CS170309 DAILY CONSTRUCTION REPORT DATE ___03/09/2017__3:30pm__ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Overcast OWNER CITY of COPPELL TEMP 71 WIND S 13 MPH CONTRACTOR: CORE 73 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: No work was performed today The monument crew is onsite preparing to install the letters on the monuments No other work was performed today SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.