PA1501B-CS170310
DAILY CONSTRUCTION REPORT
DATE ___03/10/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Overcast
OWNER CITY of COPPELL
TEMP 56
WIND NNE 9
CONTRACTOR: CORE
79
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
The lettering was being installed on the south monument.
I informed the contractor that the traffic control didn’t look correct
While the contractor was working on the west monument, I had to inform the contractor to shut down because the traffic control was still wrong
and it was almost 3:00pm
SIGNATURE