PA1501B-CS170309 (2) DAILY CONSTRUCTION REPORT DATE ___03/09/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Overcast OWNER CITY of COPPELL TEMP 71 WIND S 13 MPH CONTRACTOR: CORE 73 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West The landscapers are installing irrigation and finishing landscaping The architect and the engineer is performing their walk-thru today East Miller Sierra is pouring the sidewalk on the north side of the property to connect the 2 existing sidewalks The contractor is still working on installing brick on the pavilion and working on the roof Core is preparing to backfill the retaining wall SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.