PA1501B-CS170310 (2)
DAILY CONSTRUCTION REPORT
DATE ___03/010/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Overcast
OWNER CITY of COPPELL
TEMP 66
WIND NNE 9
CONTRACTOR: CORE
79
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
The landscapers are installing irrigation and finishing landscaping
The architect and the engineer has already performed walk-thru for the project
East
The contractor is backfilling the retaining wall on the retaining wall at the bridge.
CORE is still backfilling the retaining wall at the performance pavilion
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.