PA1501B-CS170313 DAILY CONSTRUCTION REPORT DATE ___03/13/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Overcast OWNER CITY of COPPELL TEMP 73 WIND S 25 CONTRACTOR: CORE HUMIDITY 76 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West The assistant GC for Core, Matt Mabry and I performed a pre-walk thru to show some of the surface issues that need to be addressed prior to the official walk-thru The contractor and I both have a list, I will type the list and send it to the assistant GC for the project East The contractor is still working on the pavilions SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.