Loading...
PA1501B-CS170320 DAILY CONSTRUCTION REPORT DATE ___03/20/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Sunny OWNER CITY of COPPELL TEMP 86 WIND S. 19 CONTRACTOR: CORE HUMIDITY 35 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West -Core is installing sealant to the sidewalk and to the parking area -Mowing grass by the houses -Finishing the soft trail on the north side of the property East -Hauling stock piled dirt off the property -Installing bricks on Grand Pavilion column and walls -Bricks at Boardwalk pavilion -Roofing on the performance pavilion SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.