Loading...
Freeport NIP(4)-CS 96061007/10/96 WED 11:47 FAX 214 MEPC Transmittal $,~.7012 214 851 7812 MEPC MEPC American Properties, Inc. 15303 Dallas Parkway, Suite 100 Dallas, Texas 75248 851-7000 fax 851-7012 Date,: July 10, 1996 From: Robert Ahmuty To: Ken Griffin City of Coppell fax 304-3570 Total Number of~P~ ~~~ Comments: ,,~ Tract 5 ' ( Freeport North Industrial Park We are finalizing our agreement with Emerson Partners to establish the amount of Roadway Impact Fee credits for Emerson to transfer to MEPC. Tract 5 is 27.8 acres. I have calculated the fees based on developing buildings to achieve 50% coverage on the site, Since thc buildings are designed for warehouse/distribution, do I need to include a line item for any assumed office area, at a different rate? Should I also assume that some portion of a lease may be use for light assembly, and use a different rate for it? Please review and call me with comments. ~j Thank you. 07/10,'96 WED 11:47 FAX 214 851 7012 MEPC Fr®e~ort North Tract 5 10-Jul-96 002 Roadway Impact Fee Calculations (assumes total development considered General Light Industrial) A, Service Area B. Category C. Land Use D. Building Size E Development Units F. Vehicle Miles per Development Unit G. Fee per Vehicle Mile 4 Industrial General Light Industrial 27,8 acre ~ 50% coverage Bldg area 1 1,000 From Table 3 605.484.00 605.48 1,06 300.00 Total Fee Due 100% (E x F x G) $ 192,543.91 Credit for 75% $144,407.93 Amount due ( 25% ) $ 48,135.98 Roadway Impact Fee Calculations (assumes that each lease Is Individually considered) A Service Area B. Category C. Land Use D. Building Size Warehouse use 70% Manufacturing use 20% Office use 10% TOTALVEHICLEMILES 4 Industrial General Light Indu~rial 27,8 acre~50%coverage 605,484.00 AREA SVC UNITS VEH. MILES 423,839 1.06 449.27 121,097 2.61 316,06 60,548 3,99 241.59 1,006.92 G. Fee per Vehicle Mile $ 300.00 Total Fee Due 100% (E x F x G) $ 302,075.97 Credit for 75% 226,556,98 Amount due ( 25% ) $ 75,518,99