PA1501B-CS170324
DAILY CONSTRUCTION REPORT
DATE ___03/24/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER CITY of COPPELL
TEMP 59
WIND S. 12
CONTRACTOR: CORE
80
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
-Robert from CORE said that they would not be able to stripe the pavement because of the poor weather
-I informed the contractor that the we would still have a walk-thru even though the stripping wasn’t complete
East
-Robert from CORE is trying to see if the electrical line is energized so that the CORE can stop using the generator
-The plumber finished making the connection to the meter, the contractor has added another double check