Loading...
PA1501B-CS170324 DAILY CONSTRUCTION REPORT DATE ___03/24/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Cloudy OWNER CITY of COPPELL TEMP 59 WIND S. 12 CONTRACTOR: CORE 80 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West -Robert from CORE said that they would not be able to stripe the pavement because of the poor weather -I informed the contractor that the we would still have a walk-thru even though the stripping wasn’t complete East -Robert from CORE is trying to see if the electrical line is energized so that the CORE can stop using the generator -The plumber finished making the connection to the meter, the contractor has added another double check SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.