Loading...
Freeport NIP(4)-CS 96022902/29/96 T]~ ~E?C ~ 00! 214 851 7012 09:24 FAX 214 851!,~12 MEPC ME]PC ~e~ican Properties, Inc. 15~03 Dallas P~rkway, Suite 100 Dallas, Texas 75248 851-7000 fax 851-7012 Date: February29,1996 From: Robert Ahmuty To'- Ken C-tiffin City of Coppcll VIA FAX: 304-3673 Total Number of Pages: 1 Comments: F~reeport North Business Park lT-- I am trying, once again, to determine Roadway impact fees for the development of this site. We are looking at 52 acres fronting Royal Lane, and needing Creek'view Drive extended to the southwest. Assuming a 50% coverage, my calculations are: 52 acres = 2,265,120 SF 50% coverage - 1,132,560 sf total buildings Roadway Impact Fee = 1.06 x 300 x (Building SF/1,000) Total Roadway Impact Fee = $360,154 There is a letter from Jim Witt to Munsch, Hardt, Kopf, Hart and Dinan regarding credits and offsets of 75% for Royal Lane and Oateview Drive, and 50% for Northpoint. How are these credits applied? Do I assume that thc Impact Fccs are reduced by 75% for this site, since it fronts Royal, and is not adjacent to, or even close to, Northpoint? Does the construction cost for the extension of Creckview Drive affect the above totals? Does the City contr/butc to the construction costs of Creekvicw? Are there any additional impact fccs or escrow money duc to the City because of the Creekview extension? Besides utility connection costs and utility impact fees, what other city fees are associated with developing this property? copy: Ab Atkinz