Prologis Park 121 Northwest Dr--DR170227
DAILY CONSTRUCTION REPORT
DATE ___02/27/2017__________ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER CITY of COPPELL
TEMP 75
WIND S 15
CONTRACTOR: CORE
HUMIDITY 67
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Earth Basics was on site Saturday grading the road on the north section of Northwest Dr,
I still need the rest of the sewer reports for Northwest Dr. south.
CalHar is going to attempt to finish the water line at 121 tomorrow
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.