Prologis Park 121 Northwest Dr--DR170228
DAILY CONSTRUCTION REPORT
DATE ___02/28/2017__________ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 79
CONTRACTOR: CORE
WIND S 17
HUMIDITY 59
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
No work was performed today.
CalHar was supposed to start with the connection to 121 service road
I informed Chance from Mycon the stamped area needed to be on the customer side of the R.O.W. He informed me that the Stamped areas on
Freeport were in The City R.O.W.
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.