Loading...
Prologis Park 121 Northwest Dr--DR170228 DAILY CONSTRUCTION REPORT DATE ___02/28/2017__________ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER CITY of COPPELL TEMP 79 CONTRACTOR: CORE WIND S 17 HUMIDITY 59 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: No work was performed today. CalHar was supposed to start with the connection to 121 service road I informed Chance from Mycon the stamped area needed to be on the customer side of the R.O.W. He informed me that the Stamped areas on Freeport were in The City R.O.W. SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.