Prologis Park 121 Northwest Dr--DR170302
DAILY CONSTRUCTION REPORT
DATE ___03/02/2017__03:10pm_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 64
CONTRACTOR: CORE
WIND N 19
13
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
I met onsite with the contractor and the water department to see which valves needed to be turned off and what businesses needed to be informed.
I informed the contractor that the the whole line needed to be BT tested.
I spoke with Jerry Davis about the BT tested and the connection of the new valve and 8” connection. Jerry Said it was ok for them to not BT the
whole line as long as there are no muddy water that touches the pipe.
I informed the contractor that I needed to be there for the de-watering, swabbing, connection, and the flushing of the water line.