Loading...
Prologis Park 121 Northwest Dr--DR170302 DAILY CONSTRUCTION REPORT DATE ___03/02/2017__03:10pm_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER CITY of COPPELL TEMP 64 CONTRACTOR: CORE WIND N 19 13 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: I met onsite with the contractor and the water department to see which valves needed to be turned off and what businesses needed to be informed. I informed the contractor that the the whole line needed to be BT tested. I spoke with Jerry Davis about the BT tested and the connection of the new valve and 8” connection. Jerry Said it was ok for them to not BT the whole line as long as there are no muddy water that touches the pipe. I informed the contractor that I needed to be there for the de-watering, swabbing, connection, and the flushing of the water line. SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.