Prologis Park 121 Northwest Dr--DR170303
DAILY CONSTRUCTION REPORT
DATE ___03/03/2017__03:10pm_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 64
CONTRACTOR: CORE
WIND N 19
13
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Chance from Mycon informed the Fire Department anout the building having low pressure when the line is shut off
Mycon also informed the the owner of the building.
I witness all of the parts of the connection to make sure that the connection was made according to the Jerry’s expectations
After the connection, the CalHar flushed the line for an hour
I informed the contractor that the wire needed to be reconnected