Prologis Park 121 Northwest Dr--DR170303 DAILY CONSTRUCTION REPORT DATE ___03/03/2017__03:10pm_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER CITY of COPPELL TEMP 64 CONTRACTOR: CORE WIND N 19 13 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Chance from Mycon informed the Fire Department anout the building having low pressure when the line is shut off Mycon also informed the the owner of the building. I witness all of the parts of the connection to make sure that the connection was made according to the Jerry’s expectations After the connection, the CalHar flushed the line for an hour I informed the contractor that the wire needed to be reconnected SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.