Prologis Park 121 Northwest Dr--DR170314
DAILY CONSTRUCTION REPORT
DATE ___03/14/2017__10:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Sunny
OWNER CITY of COPPELL
TEMP 59
CONTRACTOR: CORE
WIND SSE 6
HUMIDITY 32
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
I received the lab results back from Lewisville on the Bac-T samples
Both of the results came back negative so I will have the water line opened tomorrow
Pavemon is mixing soil cement on the north section of Northwest Dr. today