Loading...
Prologis Park 121 Northwest Dr--DR170314 DAILY CONSTRUCTION REPORT DATE ___03/14/2017__10:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Mostly Sunny OWNER CITY of COPPELL TEMP 59 CONTRACTOR: CORE WIND SSE 6 HUMIDITY 32 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: I received the lab results back from Lewisville on the Bac-T samples Both of the results came back negative so I will have the water line opened tomorrow Pavemon is mixing soil cement on the north section of Northwest Dr. today SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.