Prologis Park 121 Northwest Dr--DR170314 (2)
DAILY CONSTRUCTION REPORT
DATE ___03/14/2017_03:45pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Sunny
OWNER CITY of COPPELL
TEMP 59
CONTRACTOR: CORE
WIND SSE 6
HUMIDITY 32
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Mycon is hanging wall panels
Potter should be finished pouring wall panels by the end of the week
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.