Prologis Park 121 Northwest Dr--DR170316 (2) DAILY CONSTRUCTION REPORT DATE ___03/16/2017_11:30am__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Cloudy OWNER Prologis TEMP 60 WIND S 14 CONTRACTOR: Mycon 85 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Mycon is hanging wall panels Potter is prepping the north side of the property Mycon has requested inspection late afternoon for steel and base inspection Mycon is still hanging steel for the wall panels SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.