DAILY CONSTRUCTION REPORT
DATE ___03/16/2017_11:30am__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER Prologis
TEMP 60
WIND S 14
CONTRACTOR: Mycon
85
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Mycon is hanging wall panels
Potter is prepping the north side of the property
Mycon has requested inspection late afternoon for steel and base inspection
Mycon is still hanging steel for the wall panels
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.