Loading...
Prologis Park 121 Northwest Dr--DR170317 (2) DAILY CONSTRUCTION REPORT DATE ___03/17/2017_12:30pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER Prologis TEMP 73 CONTRACTOR: Mycon WIND S. 22 60 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: No panels are being hung today because it’s too windy I informed Chet that the plans call for the header to be installed so they will be in by Monday I inspected the steel in the parking area Potter should be pouring concrete on Monday at 7:00am SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.