DAILY CONSTRUCTION REPORT
DATE ___03/21/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Sunny
OWNER Prologis
TEMP 81
WIND S. 15
CONTRACTOR: Mycon
HUMIDITY 41
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-I sent a response to Chance that it was ok to trench the irrigation line and re-compact it
-The water line on Northwest Dr. South still needs to be plashed. I sent an email stating that it needs to be flushed son of we will need to re-test it
-Pavecon is working on the form work for the road