Prologis Park 121 Northwest Dr--DR170321 DAILY CONSTRUCTION REPORT DATE ___03/21/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Sunny OWNER Prologis TEMP 81 WIND S. 15 CONTRACTOR: Mycon HUMIDITY 41 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I sent a response to Chance that it was ok to trench the irrigation line and re-compact it -The water line on Northwest Dr. South still needs to be plashed. I sent an email stating that it needs to be flushed son of we will need to re-test it -Pavecon is working on the form work for the road SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.