Prologis Park 121 Northwest Dr--DR170322 DAILY CONSTRUCTION REPORT DATE ___03/22/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER Prologis TEMP 81 CONTRACTOR: Mycon WIND SSE 13 51 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I informed Chance that the water line may need to be Bac-T -I informed Eric Terry that the sewer line needed to monolithic -Eric said that he will check all the manhole elevations. They will block out any manholes that need to be changed. -Jose will be onsite tomorrow to flush the water line SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.