Prologis Park 121 Northwest Dr--DR170323
DAILY CONSTRUCTION REPORT
DATE ___03/23/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER Prologis
TEMP 80
CONTRACTOR: Mycon
WIND S. 36
43
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-The Water Department and CalHar came onsite and they flushed the water line on Northwest Dr. South
-Eric from Pavecon informed me that the work would start from the Subaru fire lane and head southwest and then start from Freeport and head
west.
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.