Prologis Park 121 Northwest Dr--DR170323 DAILY CONSTRUCTION REPORT DATE ___03/23/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER Prologis TEMP 80 CONTRACTOR: Mycon WIND S. 36 43 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -The Water Department and CalHar came onsite and they flushed the water line on Northwest Dr. South -Eric from Pavecon informed me that the work would start from the Subaru fire lane and head southwest and then start from Freeport and head west. SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.