Loading...
Prologis Park 121 Northwest Dr--DR170327 DAILY CONSTRUCTION REPORT DATE ___03/27/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER Prologis TEMP 65 CONTRACTOR: Mycon WIND N. 9 HUMIDITY 65 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Pavecon finished tying the steel for Northwest Dr. -Pavecon tied set-up the machine and pre-ran the machine to make sure that it ran properly -I inspected the steel spacing and depth SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.